Audit/Retrofit

£0.00

Audit or Plant Assessment: (40 to 60 hours)

  1. As above to establish a calibrated model. More operational data is required

  2. More details of the installed equipment are required

  3. The trends are analysed with focus on DWF and RWF transition for municipal systems. Industrial plants will focus on peak loads and buffering capacity.

  4. A more detailed map can be made of energy consumption, chemical consumption and potential operational cost savings.

  5. Potential capacity expansion will be addressed 

  6. Potential N2O readiness can be explored if enough Nitrogen quality data is provided

  7. Sludge production can be addressed and biomass and separation processes addressed.

  8. Sludge dewatering may be addressed if deemed critical KPI

  9. An audit is per operational configuration. If plant has several independent technologies running as a whole the audit needs to stretch to all biological configurations. E.g. A German plant had an old 1960 filter-bed system, a 1985 Barden-pho system and a 2004 MUCT process.

  10. A full report is produced and recommendations are made.

  11. This report is essential to help the AI digital twin process and potential operational optimisation. It defines critical plant equipment for AI modelling and gives an idea of potential impact.

  12. 100-125£/hour (125-145euro/h)

Audit or Plant Assessment: (40 to 60 hours)

  1. As above to establish a calibrated model. More operational data is required

  2. More details of the installed equipment are required

  3. The trends are analysed with focus on DWF and RWF transition for municipal systems. Industrial plants will focus on peak loads and buffering capacity.

  4. A more detailed map can be made of energy consumption, chemical consumption and potential operational cost savings.

  5. Potential capacity expansion will be addressed 

  6. Potential N2O readiness can be explored if enough Nitrogen quality data is provided

  7. Sludge production can be addressed and biomass and separation processes addressed.

  8. Sludge dewatering may be addressed if deemed critical KPI

  9. An audit is per operational configuration. If plant has several independent technologies running as a whole the audit needs to stretch to all biological configurations. E.g. A German plant had an old 1960 filter-bed system, a 1985 Barden-pho system and a 2004 MUCT process.

  10. A full report is produced and recommendations are made.

  11. This report is essential to help the AI digital twin process and potential operational optimisation. It defines critical plant equipment for AI modelling and gives an idea of potential impact.

  12. 100-125£/hour (125-145euro/h)