Full System Appraisal

£0.00

Full system Appraisal Audit: (120-160 hours) (Feasibility Study)

  1. As Audit above but considerably further in-depth analysis over historical and present time data. 

  2. This appraisal is best applied to potential retrofit plants where massive capital expenditure could be avoided for a Green-field site. Here alternative configuration and other technologies are investigated to get the maximum performance out of the existing structures and equipment.

  3. Highly advanced techniques are used in this assessment such as Potential AI buffering, AI network assessment, Membrane separation, polishing and any potential ideas the customer wishes to explore.

  4. Renewables and Net-zero can be addressed and full energy and mass balances made.

  5. The report would highlight potential infrastructure maximisation to deliver the quality required by the client. Costing can be addressed as a rough estimation.

  6. This appraisal requires more information from the client and certainly more dialogue. 

  7. This Full System Appraisal FSA: Can be used to cost a detailed design.

  8. This type of report is often used by the clients management to make a strategic decision on capital investment or operational prolongation based on hydraulic or load expansion.

  9. 100-125£/h (125-145euro/h)

Full system Appraisal Audit: (120-160 hours) (Feasibility Study)

  1. As Audit above but considerably further in-depth analysis over historical and present time data. 

  2. This appraisal is best applied to potential retrofit plants where massive capital expenditure could be avoided for a Green-field site. Here alternative configuration and other technologies are investigated to get the maximum performance out of the existing structures and equipment.

  3. Highly advanced techniques are used in this assessment such as Potential AI buffering, AI network assessment, Membrane separation, polishing and any potential ideas the customer wishes to explore.

  4. Renewables and Net-zero can be addressed and full energy and mass balances made.

  5. The report would highlight potential infrastructure maximisation to deliver the quality required by the client. Costing can be addressed as a rough estimation.

  6. This appraisal requires more information from the client and certainly more dialogue. 

  7. This Full System Appraisal FSA: Can be used to cost a detailed design.

  8. This type of report is often used by the clients management to make a strategic decision on capital investment or operational prolongation based on hydraulic or load expansion.

  9. 100-125£/h (125-145euro/h)